I'm also adding a 2nd set of reef points for the FL 120.
I put in the 1st set myself (Jiffy Reef kit from Sailrite), as I have access to the sewing machines, grommet setting tools, etc., at work.
The only change I made to their system is I use a reef hook at the tack instead of the second reef line.
The 1st reef point is just below the 1st batten, per the Sailrite instructions, and as you describe. Can you do me a favor and measure (up from the foot) how far up your sailmaker installed your 2nd set? I've already received the sailcloth triangles, etc., from Sailrite to do the job, just mulling over how far above the 1st set to put the 2nd set, and it would be easier just to work off of how far it is above the foot ...
Also, and jeadstx, this speaks to your post, I intend to use the same leech/clew reef line for both sets. The guy at Sailrite says that this should work fine, but you say you have jiffy reef set up on the boom for both sets? Are you using a reef hook at the tack? Are you using 2 different bullet blocks/reef lines at the clew? I've seen separate sytems on bigger boats, but it seems to me that one line/bullet block would work for both reef points on the DS?
No matter what, I won't have time to install the second set before the Trans-Monroe this Sat - hope I don't need it!
